We are experiencing a very high volume of EDD cases. If you have questions or need assistance with EDD, please fill out our EDD Assistance form and we will do our best to help. Please note there may be a delay in response.
El Segundo Check Presentation for Electric Vehicle Charger Construction
Local singing group performing
Asm. Muratsuchi speaking with local official
Asm. Muratsuchi speaking with attendee
Electric golf cart parked in designated EV parking spot
Small electric vehicle parked in designated EV parking spot
Guest speaker at podium, speaking
Guest speaker at podium, speaking
Guest speaker at podium, speaking
Guest speaker at podium, speaking and gesturing to the side
Asm. Muratsuchi at podium, speaking
South Bay Local Travel Network sign unveiled
EV Golf cart parking sign being unveiled
Asm. Muratsuchi and others look on as cerimonial ribbon is cut
Asm. Muratsuchi speaking to member of the press
Asm. Muratsuchi taking photo with two attendees
Asm. Muratsuchi waving as he drives electric vehicle
Asm. Muratsuchi and others holding up large ceremonial check
Assemblymember Muratsuchi presented a big check at El Segundo City Hall for the construction of more electric vehicle chargers.
Connect with me:
Contact
Capitol Office
Capitol Swing Space
1021 O Street, Suite 5310
Sacramento, CA 94249-0066
(916) 319-2066
District Office:
3424 W. Carson St.
Suite 450
Torrance, CA 90503
(310) 375-0691